Marketing site design
The full engagement for a marketing site. Research into your buyers and your search demand, a sitemap with a written job for every page, and wireframes for the priority pages. Then a visual direction decided with you in the room, and templates designed in a component system (the shared parts every page is assembled from), documented for handoff.
Businesses whose site has to win buyers and rank, and whose current one does neither: a launch, a repositioning, or a site that has outgrown its last redesign. It does not fit a team that needs one campaign page, which the landing page option covers, or a product interface, which is UI/UX design.
- Analytics, heatmap and search-demand review, with a written job for every page
- Sitemap, page-level jobs and wireframes for the priority pages
- A visual direction presented with rationale and decided together
- Templates designed in a component system, WCAG 2.1 AA in the base spec
- Dev-ready files documented for handoff, designer on call during the build
- Copywriting
- Photography and illustration
- The build itself (see Design to code)
- An ongoing CRO programme
- Turnaround
- 3 to 6 weeks; first pages within 14 days of NDA
- Moves the number
- Template count, not page count: a 42-URL site is usually seven templates.