Skip to content

Get your stalled software project
moving again.

An agency that stopped answering. Code nobody can make sense of. A launch that's been "two weeks away" since spring. Our software project rescue services start with a no-blame audit of what actually exists. Sometimes the right answer is to finish it, not rebuild it.

NDA first · Verdict in writing · Reply within four business hours (typical)

Brands our teams have delivered for

  • Hello Peter
  • Gruber Logistics
  • Delhivery
  • Thomson Reuters
  • Qatar Airways
  • Grundfos
  • Save
  • BERD
  • Yale University
  • Kuwait Police
  • Dubai Police
  • Panasonic
  • Infosys
  • Kia
  • Hitachi
  • Orange Business Services
What we do

PixelCrayons rescues stalled software projects, starting with a no-blame audit of what exists. Senior engineers read the code, servers and backlog. Then they write down what's sound, what can be saved and what each option costs. Sometimes the answer is to finish it, not rebuild it. The audit is small and fixed, and the verdict is yours either way.

  1. DevelopmentSenior engineers in web, commerce and integrations who take over builds halfway through.
  2. Web DevelopmentMake the system stable, finish the last ten per cent and launch what was promised.
  3. QA & TestingTests around what works today, so tomorrow's fixes can't quietly break it again.
From stuck to shipping

We read the code first,
then we repair it.

01
Start

Brief and access

We sign an NDA and talk through the project's state, the access you hold and the deadline that matters. We take read-only access and change nothing yet.

02
Once the brief is complete

Audit and itemised proposal

We confirm the date the written verdict arrives: what's sound, what's salvageable, and a priced plan to finish, stabilise or rebuild.

03
Your decision

You sign off

You confirm the scope, the payment and the access we need. Nothing starts before this.

04
Typically 2 to 3 business days later

The work starts

Backups, monitoring and broken flows come first, so things stop getting worse.

05
On the date in your proposal

Worked to launch

The plan is worked to launch, reported weekly against the deadline that matters.

Inside Prism

Your engagement, week to week,
in one workspace.

Prism is the client workspace where your requests, approvals, tasks and weekly reviews live.

A solution spans several disciplines. Some engagements include Prism, our client workspace, and your proposal says whether yours does. Where it does, the work runs in one workspace you log into: one request queue, one task list and one weekly review across all of it.

  • 01

    One queue across disciplines

    One request list, one task list, one review.

  • 02

    Weekly review

    Each decision recorded, with the expectation attached.

  • 03

    Cost per qualified lead

    Fully loaded. Unmeasured spend shows as unknown, never zero.

Our work

See what we've built
and the results it brought.

Real projects for real clients, with results we can show.

All case studies →
Technologies we work with
Commerce and web
  • Shopify
  • WooCommerce
  • Magento
  • WordPress
  • Webflow
  • Next.js
Marketing
  • Google Ads
  • Meta Ads
  • GA4
  • Klaviyo
Cloud
  • AWS
  • Microsoft Azure
  • Google Cloud
AI models
  • OpenAI
  • Anthropic
  • Google Gemini
Build and deploy
  • Docker
  • Kubernetes
  • Terraform
  • GitHub Actions
CRM and automation
  • HubSpot
  • Salesforce
  • Zapier
  • n8n

Product names and marks are trademarks of their owners. Naming a technology means our teams build with it. It does not mean a partnership, certification or endorsement.

Proof

Our nearest published case:
taking over an agency's backlog.

Brand panel: anonymised case study, multi-location healthcare, US, a delivery team inside an agency
Healthcare · US
Via agency partner · white-label

Multi-location healthcare: delivery unblocked.

We haven't published a rescue yet. This is the nearest case. The same senior team took over someone else's backlog halfway through, under an agency's brand. That is most of what a rescue is. Delivery velocity rose 85%.

85%
Faster delivery
Cleared
Delivery backlog
Read the full case

We worked with PixelCrayons for around three years, with their developers becoming a genuine extension of our team. Having consistent developers who understood the work and could stay with us over the long term made a real difference to continuity and delivery.

Qubittum (formerly Massive Analytic)Long-term development partner
Sound familiar?

Four ways projects
end up needing rescue.

01

The agency went quiet

Replies slowed, then stopped, but the invoices didn't. Now you're halfway through a build. The product is half-finished, you may not hold the logins, and the launch date slips every week. The priority isn't arguing about what happened. It's getting back access, control and momentum, in that order.

Ghosted
02

A codebase nobody understands

The developer who built it left, or the supplier who knows it won't share. There's no documentation and no tests, and every release feels like a coin toss. Every small change is priced like surgery, because without a map, it is.

Inherited
03

Launch stuck at ninety per cent

It looks great in demos but never launches. The last ten per cent is the hard part: edge cases, integrations, QA and performance. It's been "two weeks away" for months. What ran out wasn't effort. It was momentum, and momentum can be restored.

Stalled
04

The fix made it worse

A platform move that sank your traffic. A rushed patch that broke checkout. A redesign that doubled the bounce rate. Each fix added a layer, and now nobody knows which layer hurts. Careful untangling beats another confident rewrite.

Regressing
Who is accountable

The people responsible
for your work.

Leadership and how we’re built →
Parvessh Agarwal

Parvessh Agarwal

Founder & CEO

An entrepreneur at heart. He links business analysis, strategy, clear goals and ROI to practical technology.

LinkedIn →
Saundaraya Gupta

Saundaraya Gupta

Technical Manager

Brings technical work, client updates and project management together, so work moves smoothly from brief to launch.

LinkedIn →

Every engagement

A named coordinator and escalation contact

Know who coordinates your engagement, who owns the work and how to escalate an issue.

All engagements. Roles may be combined and vary with your engagement.

Full terms →
Before you sign

Our commitments

Each one says where it applies and links to its full terms.

Response and start times

We typically respond within four business hours. Eligible engagements can typically start within two to three business days after scope, payment and required access are confirmed.

Business hours are Monday to Friday, 9:00 am to 6:00 pm IST, excluding published company holidays. Typical expectations, not guaranteed service levels.

Full terms

Clear IP & Ownership Terms

Your materials remain yours. Bespoke deliverable rights, licences and handover are agreed before work starts.

All engagements.

Full terms

Clear Delivery & Escalation Ownership

Know who coordinates your engagement, who owns the work and how to escalate an issue.

All engagements. Roles may be combined and vary with your engagement.

Full terms

How we handle claims, credentials and your data: group credentials, dated ratings, how case figures are signed off, client permissions and data handling.

Inside the audit

What the no-blame audit reads,
and what each part decides.

Senior engineers read before anyone touches anything, on read-only access. Each part of the audit feeds a specific line of the written verdict and its priced plan.

What we readWhat we look forWhat it decides
Who holds whatRepositories, domains, hosting, analytics and ad accounts, and who holds each credentialThe handover request to the old agency, in the right order, and what has to be rebuilt because it cannot be recovered.
The repositoryCode quality, test coverage, and the security and data-handling basicsWhat is structurally sound, what needs surgery and what should be replaced.
Deploys and backupsWhat actually happens on a deploy, and whether backups exist and are verifiedThe stabilisation items that go first: backups, monitoring, and the flows losing money or trust.
The backlog, against what was promisedWhat is left between the build and the promise, often the last ten per cent: edge cases, integrations, QA and performanceWhether the verdict is finish it, don't rebuild it, and what finishing costs.
The stack you already haveWhether it can reach your goalsWhether we keep working in it. We stay with your technology unless the audit shows it cannot work. We don't comment on the previous team's choices.

If a rebuild is cheaper than untangling, the verdict shows the arithmetic. If the project is not worth saving, it says that too, and the report is yours either way.

Questions

Frequently
asked.

Yes. Software development project rescue means half-finished builds, inherited code and suppliers who vanished mid-contract. We work with the technology you have, unless the audit shows it can't reach your goals. We don't comment on the previous team. All we need is access: the code repository, hosting and any logins you can gather before the audit.

Only if the evidence says so, and it usually doesn't. "Burn it down" is the most profitable advice an agency can give, so be wary of it. The written verdict says what's sound, what needs major work and what should be replaced. When a rebuild is cheaper than untangling, we show the sums.

Senior engineers check the code, servers and backlog against what was promised. They look at code quality, tests, releases, backups, security, data handling and who holds which logins. You get a written verdict with a priced plan. "No blame" is practical. Naming culprits changes nothing, and blame makes people hide the facts a rescue needs.

Often, on the practical side. We list what they hold: code repositories, domains, hosting, analytics and ad accounts. Then we run a clear handover request in the right order. Anything that can't be recovered gets rebuilt, priced line by line. We won't act as your lawyer. A contract dispute goes to yours, while we run the technical recovery.

Making the system stable comes first in every rescue plan. We check backups, set up monitoring and repair the flows losing money or trust. Eligible work can typically start two to three business days after scope, payment and required access are confirmed. We sort emergencies by urgency on the first call. But we won't rush a fix into a system we haven't read.

Then it says so, and that's the cheapest bad news you can get. The audit is small and fixed, and the report is yours either way. It gives findings, costs and options you can act on with us or anyone else. If we recommend a rebuild, it comes priced, in stages and explained.

Stalled isn't dead.
Get the verdict.

Tell us what's stuck, no blame required. A senior engineer reads what exists and returns a written verdict with a priced plan: finish, stabilise or rebuild, whichever the evidence supports. Once we have a complete brief, we confirm when it arrives.

Verdict in writing · Reply within four business hours (typical) · NDA standard

Last updated